Frequently Asked Questions
A new 31-storey purpose built rental building with 289 rental units is being proposed for the site, which would preserve the existing 50 Park Road pavilion and will include replacement of the existing rental units on site today.
We believe that Toronto and the GTA needs more rental housing and that locations such as this site, which is a short walk to two subway lines and community infrastructure, are the ideal place for redevelopment and an environmentally sustainable choice. Provincial and local policies guiding development in the area support this as well.
All 40 of the rental units on site today will be replaced in the new development. All tenants who live at 40 Park Road when the application was submitted and when the notice to vacate is distributed later in the process, will have the right to return to one of the new rental replacement units.
The existing heritage building at 50 Park Road will be preserved and incorporated with the new development. The intention is to restore altered or lost architectural elements, while making necessary modern upgrades to ensure the building’s longevity. We will work with City Staff through the process to ensure that redevelopment respects the building’s historical and architectural significance.
A primary goal of the redevelopment is to respect the surrounding ravine context. Creating an open ground floor in the new building and introducing new landscaping, a widened boulevard and public realm improvements will bring this context into the site, creating a significantly improved experience for pedestrians in the streetscape. In addition, the three existing driveway entrances will be reduced to a single vehicular entrance to improve pedestrian safety, and garbage pickup will be diverted from the street to a dedicated on-site loading facility to improve overall site circulation.
No. Multiple approvals need to be in place before we can begin any work on site. We are at the beginning of the process, and we anticipate that it will take several months for the City of Toronto to review the Zoning By-law Amendment application before any decisions are made. There will be additional requirements, such as a Site Plan Application, prior to starting construction. As a result of this, we are still a year or two away from any changes being made on site.
Yes. All tenants will have access to the new amenities in the rental replacement building that is being proposed as part of this redevelopment.
Visit the Get in Touch page to ask us your questions, and provide feedback about the proposal.